AIM Success Story: Pin-In-Paste
An AIM customer approached us for assistance developing a Pin-In-Paste (PiP) process. In close collaboration with AIM’s technical engineers, a 3 phase Design of Experiment (DOE) was performed to evaluate and implement the necessary materials and techniques.